Brahmin Solutions
Features/MRP & Forecasting

Know what to make before you run out

Material requirements planning tells you exactly what to produce and what to buy — based on real orders, current stock, and supplier lead times. No more guessing.

New to MRP? Read our complete guide to MRP software — what it does, how to evaluate it, and what it costs.

300+ manufacturers · From $199/month · 30-day money-back guarantee

One-click MRP

Run your MRP in one click

Brahmin analyzes your open sales orders, current stock levels, production schedule, and vendor lead times — then tells you exactly what to make and buy, and when. Generate the work orders and POs directly from the MRP output.

  • Reads from live orders, stock, and open POs
  • Factors in lead times and safety stock
  • One click to generate all work orders and POs
  • Run anytime — takes seconds, not hours
MRP — next 30 daysRun complete
ItemActionQty
Organic Maple GranolaMake1,000 lbs
Organic Rolled OatsBuy800 lbs
Maple SyrupBuy200 L
Sunflower OilBuy40 gal
Based on 12 open sales orders

Projected shortages

Maple Syrup−158 L
Have

42 L

Need

200 L

Need by

Mar 12

Sunflower Oil−12 gal
Have

28 gal

Need

40 gal

Need by

Mar 15

Sea Salt−4 lbs
Have

8 lbs

Need

12 lbs

Need by

Mar 20

Shortage alerts

See shortages before they stop production

Brahmin flags materials that will run short before your next production run — with enough lead time to actually do something about it. You see what you are missing, how much you need, and when you need it by.

  • Projected shortage alerts by item and date
  • Shows gap between current stock and what is needed
  • Lead time-aware — alerts fire with enough time to order
  • Link directly from alert to create a PO
Forecasting

Plan ahead with scenario modeling

Ask "what if we get that big order?" before it arrives. Brahmin lets you model demand scenarios — increase volume by 30%, add a new SKU, or plan for a seasonal spike — and shows you exactly what you would need to buy and make.

  • Scenario planning with custom volume multipliers (coming soon)
  • Forecast based on historical sales patterns
  • Project inventory levels by day or week
  • Safety stock settings per item

Scenario — +30% demand

If you get 30% more orders next month...

Here is what you would need to buy and make

Additional production runs

3 work orders

Extra raw materials needed

+$4,200 in POs

Earliest you could ship

Mar 22

Capacity utilization

87% (was 67%)

All features

Everything included in MRP & forecasting

One-click MRP calculation
Demand-driven material requirements
Lead time-aware purchasing suggestions
Sales order-based production planning
What-if scenario modeling
Inventory projection by date
Auto-generate POs from MRP output
Auto-generate work orders from MRP
Buffer stock / safety stock settings
Reorder point management
Forecast based on sales history
Multi-level BOM explosion
Shortage alerts before they happen
MRP run history
Export MRP plan to CSV

"Brahmin syncs to all our systems and handles batch tracking, order capture, and fulfillment — everything we need in one place."

Ryan

Chugach Chocolates

Frequently asked questions

What is MRP and how does it work in Brahmin?

MRP (material requirements planning) calculates what materials you need, how many, and when — based on your sales orders, bills of materials, and current inventory. In Brahmin, MRP runs automatically: enter a sales order, and the system explodes your BOMs, checks stock, and generates planned purchase orders for any shortages.

Do I need to run MRP manually or does it update automatically?

Brahmin updates material requirements automatically when you create or change sales orders. You can also run MRP on demand to see net requirements across all open orders at any time.

Can Brahmin handle both make-to-stock and make-to-order production?

Yes. Brahmin supports both workflows. Make-to-stock manufacturers can set target inventory levels and trigger production when stock drops below thresholds. Make-to-order manufacturers can tie production directly to incoming sales orders.

How long does it take to set up MRP in Brahmin?

Most manufacturers are running MRP within 3-6 weeks of starting with Brahmin. Setup involves importing your items, building your bills of materials, and connecting your sales channels. Our team handles onboarding and data migration.

Ready to make the switch?

Book a 30-minute demo and see Brahmin with your actual products, workflows, and team. No slides. No sales pitch.

Talk to a real person. See real software. Decide for yourself.

300+
Manufacturers
3–6 weeks
Avg. go-live
<15 min
Support response